Mainstay Composite Liner Manholes/Lift Stations
Manholes/Lift Stations
Before

A brick manhole with leaks and infiltration, prior to restoration.

Before image of a manhole


After

The same manhole two hours later lined with 3/4" of Mainstay ML-72 and 0.100" (100 mils) of Mainstay DS-5. All leaks and infiltration have been eliminated. The interior surface is smooth and continuous throughout.

 

Image of a manhole after restoration with Mainstay


Lift Stations

Because of the unique simultaneous application of the ML-72 restoration mortar and DS-5 Epoxy topcoat, this 12' diameter x 30' deep lift station was prepped, rehabilitated and corrosion proofed in a single day.


Image of a lift station after restoration with Mainstay